You are here: Home Projects Lisbjerg Instructions Health and Safety

General Requirements Material Management Shipping Instructions Traffic on site Health and Safety Site induction Emergency Response Plan
Waste Management

Health and Safety


The purpose of the safety programme is to ensure that a safe system of work is implemented and maintained such that the work is carried out in a safe and planned manner avoiding any exposure of human life and welfare.

The safety programme shall be implemented from mobilisation of the site and remain in force until demobilisation.

The H&S Programme applies to all personnel present on the AVA construction site.

Target Group

The primary target group is:

  • All personnel working on the site, ie. Site Manager, Test & Commissioning Manager, Supervisors and others with supervisory responsibilities
  • Contractors and subcontractors working for AVA and BWE


Access to the H&S Manual

The H&S Manual is available in a printed as well as an electronic version. The electronic version can be downloaded here in the column to the right in PDF format


Download H&S plan (Dan)
Download H&S plan (Eng)
H&S policy (Dan)
H&S policy (Eng)
H&S leaflet for Contractors (Dan)
H&S leaflet for Contractors (Eng)